Construction of Containerised Diesel Power Station for KPLC Baragoi:
Date of Commencement: June 2009
Date of Completion:Oct 2009
Description: The project included the building from A to Z of the several buildings, access roads, generator foundations, fuel tanks, water tanks, FRP tanks, perimeter fence and gates, pipe lines, drainage and sceptic tanks. |
 |
Kobil Petroleum Ltd: 1,200 CM Vertical Storage Tank Industrial Area Nairobi:
Date of Commencement: October 2007
Date of completion: June 2008
Description: This project includes the demolishing of the old existing water pond, excavation and rebuilding of the tank foundation and fabrication and erection of a 12 meter diameter by 12 meter high storage tank as per API 650, including pipe works and drainage. This project requires particularly professionalism since it is within the highly sensitive Fuel Depot of Nairobi where safety and health are crucial factors. |
 |
KPLC:Construction of substation in GATUNDU.
Description: Construction of a 23MVA/66KV substation |
 |
Bethlehem Construction: 60 x 30 meter Twin Go downs and Tank Farm in South Sudan for SPLA:
Date of Commencement:June 2006
Date of Completion: April 2007.
Description: The supply and installation of 2 x twin godowns of 60 x 30 meters and a 10 x 50,000 liter underground tank farm with fueling station. Warren takes special pride in this project since it was completed in record time despite the very harsh conditions in the area. |
 |
Construction of Containerised Diesel Power Station for KPLC Kiunga:
Description: The project included the building from A to Z of the several buildings, access roads, generator foundations, fuel tanks, water tanks, FRP tanks, perimeter fence and gates, pipe lines, drainage and sceptic tanks. |
 |
Shell Kenya / Uganda: Supply and installation of Fuel Storage Tanks:
Date of Commencement: March 2005
Date of completion: Continuous Contract
Description: Warren supplies fuel tanks in various sizes made out of high quality steel as per WA 300 or equivalent and BS 2594 standards.The tanks can be underground or above ground, Epoxy Painted or GRP coated. All tanks are pressure tested and provided with a KEBS approved calibration chart. |
 |
Construction of Fuel Depot in Kisangani
Description: Tristar Transport LLC DR Congo, May 2011 |
 |
JET A1 Fuel Depot Lubumbashi DR Congo
Description:PDL Toll (Australia), July 2011 |
 |
JET A1 Fuel Depot Kalemie DR Congo
Description:PDL Toll (Australia), July 2011 |
|